Lead Time Calculator
Build a realistic start time using case-based prep (fillet/bread/load), pressure frying (warmup + filtering), and assembly. Defaults match your current production standards.
Important planning note
This calculator models dedicated production conditions using standard equipment capacities, cook times, and staffing assumptions. Actual lead time can increase when normal restaurant operations are occurring at the same time.
- Guest traffic, mobile orders, and drive-thru volume can reduce fryer and labor availability.
- Staffing gaps, breaks, or reassignment will slow prep, frying, and assembly.
- Shared equipment (fryers, prep tables, toasters) introduces contention not reflected here.
For accurate planning during business hours, operators should factor in their average baseline production load and adjust start times earlier to compensate.
Order + timing
Time the order must be ready at the destination.
Staging, loading, runner time.
Order size
Standard: 155 pieces per case (fillets).
Thawing
Thaw start is calculated as fillet start − thaw hours.
Prep (case-based)
Defaults: Fillet 6 min/case, Bread 10 min/case, Load 10 min/case (±1 each).
Pressure frying (Henny Penny)
Defaults: 15 min warmup, 3 fryers, 24 per fryer per drop, 4m26s cook time, 1 min recovery.
4m26s = 4.43 minutes
Oil filtering
Assembly (12 at a time)
Defaults: 12 buns toast + pickles 40 sec, 12 sandwiches build + wrap 1.5 min.
Packaging (optional)
Results
Enter your numbers and click Calculate.